Skip to content
Compliance Automation Tools

Home / Glossary / Risk register

Glossary, read 12 Nov 2026

Risk register, defined with a sourced example

All termsThe guides

Risk register in practice

The register is where control failures become business decisions. A failing test is a task. A failing test on a control that is the only mitigation for a high rated risk is a register entry with an owner and a date. Without the link, the register is a spreadsheet nobody trusts. See risk register basics.

NIST's glossary also quotes OMB Circular A-11 (through SP 800-221 and NISTIR 8286), which defines a risk register as a repository of risk information including data understood about risks over time.

Example: Thoropass says its Risk Register is built into the same platform used for readiness and audit, and that risks are linked back to relevant controls "so you can review, assign, and remediate" without leaving the platform. That is Thoropass's own description.

Sources

  1. csrc.nist.gov/glossary/term/risk_register, read 12 Nov 2026
  2. thoropass.com/solutions, read 12 Nov 2026

Last reviewed 12 Nov 2026.